

![]()
![]()
YES
Great Choice!!
HOME / ABOUT US / SERVICES / SITE WORK / PRODUCTS / ORDER
ROADS / DRIVES / ALLEYS / RAMPS & PADS / DRAIN SYSTEMS / LAND CLEARING / GENERAL
•••••••••••••••••••••
Gravel
Surface Repairs
Rough, Badly Worn and Pot-Holed Gravel
Roads / Alleys / Parking Lots
Expertly Repaired and Leveled
Inexpensively
•••••••••••••••••••••••••••••••••••••
Currently Our Service Rates Are As Follows: March
1, 2002
Tractor, Dozer &
Excavator Services
Land Clearing • Mowing • Drainage
• Trenching • Excavating • Grading • Leveling •
Road Building & Resurfacing
Rototilling • Emergency Flood Control &
Storm Repairs • Hauling • Burn Management • Culvert
Installation • Small Site Preps
|
LABOR RATES |
PRICE |
|
Basic Labor Rate (General
Hand & Power Equipment Operation) / hr |
35.00 |
|
Help: (General Hand & Power
Equipment Operation) / hr |
35.00 |
|
Light Heavy to Medium Heavy
Equipment Operation / hr |
45.00 |
|
Heavy Equipment Operation /
hr |
50.00 |
|
Tractor Services / with Own
Equipment (Near Structures) / hr |
70.00 |
|
Tractor Services / with Own
Equipment (Roads, Fields, Gardens, etc.) / hr |
60.00 |
|
Extreme Job Site Hazards to
Specialty Equipment / Mowers ( Rocks, Steel, etc.,) / hr. |
+15% |
|
Computer Design (Custom
Attachments or Basic Site Specs) / hr |
120.00 |
|
Custom Fabrication / hr |
65.00 |
|
Mechanic / Equipment Repairs
/ hr. |
95.00 |
|
FEES |
PRICE |
|
Estimates (Deductible from
Job Cost)/ ea. |
6.00 |
|
Detailed / Itemized Proposals
(Deductible from Job Cost) / ea. |
20.00 |
|
Site Evaluations (Laser Grade
Check / Drainage assessment / etc.,) / ea. |
45.00 |
|
Acquisition Fee (Equipment
Rentals / Materials / Extra Labor) / ea. |
40.00 |
|
Rentals / Materials (plus
Delivery and Fuel) |
Costs/Plus |
|
Transportation per mile over
10 mls (Including Estimates/Inspects/Evals) / ea. Estimates / Site Inspections / Evaluations over 25 miles – Basic Labor Rate on Site plus Mileage |
.98 |
|
Backhoe Hook-up / Disconnect
/ ea. |
45.00 |
|
Hauling: Truck & Driver /
hr. |
75.00 |
|
Debris / Excavation Removal:
Basic Non-Hazard / cu. ft. |
.50 |
|
Waste Removal: cu. yd. / 1.35
tons |
67.50 |
|
Out of County / State /
Country (All Costs & Minimum $500 per day) |
Costs/Plus |
|
Pot-Hole Repair: Roads & Alleys / 14 ft. wide
/ Medium to Bad / No Gravel / ft. (Compacting: $175 extra under 250 ft.) |
3.85 |
|
Pot-Hole Repair: Roads & Alleys / 14 ft. wide
/ Severe / No Gravel / ft. (Compacting: $175 extra under 150 ft.) |
6.25 |
|
Gravel Drive-Way: Fresh
Spread Gravel Touch-Up Leveling / 1 load |
45.00 |
|
MAINTENANCE FEES |
PRICE |
|
Tractor Services / hr. |
50.00 |
|
Basic Gravel Drive: Road
Grading / Leveling / Dragging [Every 4 months] 300 ft. |
45.00 |
|
Basic Gravel Drive: Road Grading / Leveling /
Dragging [Every 4 months] each additional 100 ft.. |
30.00 |
|
Compacting: 300 ft. (14 ft.
wide) |
200.00 |
|
Compacting: (14 ft. wide)
each additional 100 ft. |
35.00 |
|
PAYMENTS / DEPOSITS |
PRICE |
|
Labor Deposit: Due at time of
Contract |
75% |
|
Materials Deposit |
100% |
|
Rentals Deposit |
100% |
|
Special Costs / Fees: Permits
/ Locates / Engineers / etc. |
100% |
To Make Payments Go to Our Order Page
••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
• For More Information
Click On A Button Below •
HOME / ABOUT US / SERVICES / SITE WORK / PRODUCTS / ORDER
ROADS / DRIVES / ALLEYS / RAMPS & PADS / DRAIN SYSTEMS / LAND CLEARING / GENERAL
This Website Designed, Developed and Formatted by www.pandaproduction.com January 1,
2002 © All Rights Reserved